The route "Obolon - Kiev (HPP) dam"
From the pier on Obolon we will go upstream along the Muromets Island, past the Desna mouth. We will go around Veliky Island, then past the island Energetik, and go to the dam of the Kiev hydroelectric power station.
Description of the turning point
In addition to the direct function of a hydroelectric power station (electricity production since 1964), it performs a protective function against the "big water" of residential areas located below 103 m above sea level. In addition, the presence of a reservoir improves navigation conditions, especially in the period of shallow water.
The Kiev hydroelectric power station is designed for 100 years of operation and has 3 degrees of protection against water breakthrough: a concrete dam, a drainage channel and an earthen dam 70 km long.